Project Description

Lockport Fire Station No. 1

Lockport Fpd Station 1 (18)

PROJECT SPECS

Description

Camosy was selected as the Construction Manager at Risk in the fall of 2015 following a competitive QBS (Quality Based Selection) process. The original Fire Station One was built in 1959 to replace the firehouse at 921 State St. in downtown Lockport. At that time, there was only one paid man per day to bring the engine to calls and volunteers responded to the scene. After 57 years of productive use, the existing station was no longer adequate to serve the needs of the modern fire department and the Fire District Board made the decision to demolish the existing station and build a new replacement at the same site.

The floor plan design of the new station is similar to existing stations No. 4 and No.5 but with specific exterior feature which recognize and pay tribute to the nearby historic seven arches bridge which was demolished. The station is approximately 9,000 square feet and includes three apparatus bays, sleeping quarters for six, an open plan combined day room, kitchen and dining area, fitness area, a three-workstation office space and the normal ancillary support and mechanical spaces.

Services Provided

Camosy provided complete Construction Management at Risk services for this project including: Preconstruction, Budgeting, Estimating, Bidding and Purchasing, Value Engineering, Constructability Reviews, and Project Management and full-time Field Supervision during construction. Preconstruction Phase planning included accounting for an existing on-site cell tower which was maintained operational throughout the duration of construction. Camosy services included full-time on-site Field Supervision throughout the Construction Phase. The work was completed in March 2017.